logo  
 
CSS MenuMaker
Synergymaxx.com
Synergymaax Image 1 Synergymaax Image 1 Synergymaax Image 1 Synergymaax Image 1 Synergymaax Image 1 Synergymaax Image 1
 
   Top Blogs (84)
Apr
31
Boost For Electric And Hybrid Cars With Rs 1.5 Lakh Subsidy
ELECTRIC/hybrid cars (XeVs) and two-wheelers could become attractive options for the Indian buyer, with the Centre planning to offer fairly large subsidies ranging from Rs 8,000 up to R12 lakh, reports Roudra Bhattacharya in New Delhi.
The ministry of heavy industries and the auto industry have now agreed on the subsidy ceili
Posted By : Admin;  (Posted 3 years ago)..
 
Dec
31
Odisha to float tenders soon for 48 MW solar power
In its efforts to maximize solar power generation and also to fulfill the renewable purchase obligation (RPO) of its bulk power purchaser Gridco, the state government would soon float tenders for new soar power capacity of 48 Mw.
Presently, on-grid solar power projects with a total capacity of 13 Mw are operational in the sta
Posted By : Admin;  (Posted 3 years ago)..
 
Dec
31
National Solar Mission bid submission deadline extended
On 20th December 2013, the Solar Energy Corporation of India (SECI) notified that the last date of submission of bids under NSM Phase 2 Batch 1 was extended to 20th January 2014 from the earlier last date of 28th December 2013.
Senior officials at SECI have said that the deadlines have been extended as the ‘stakeholders
Posted By : Admin;  (Posted 3 years ago)..
 
Dec
31
Delhi Electricity Regulatory Commission invites ideas for solar power metering
Posted By : Admin;  (Posted 4 years ago)..
 
Dec
31
Centre sets up National Institute of Solar Energy
The Central Government has set up an autonomous institute -- the National Institute of Solar Energy (NISE) -- under the administrative control of the ministry of new and renewable energy (MNRE). The NISE, which will function as the apex centre for research and technology development and related activities in the area of solar energy technologies
Posted By : solarneed  (Posted 4 years ago)..
City : Meerut
 
Dec
31
GERMI says the Solar PV Projects can be done at the Fixed cost of Rs. 3.5 Crores/MW
Successful research and development carried out by Gujarat Energy Research and Management Institute (GERMI) has brought down the fixed cost of setting up of a solar power plant to just Rs 3.5 crore per megawatt.  
Posted By : Admin;  (Posted 3 years ago)..
 
Jan
31
Environmental Benefits of Solar Power
The conservation of non-renewable energy resources
Photovoltaic (PV) solar power eases the usage of diminishing natural resources such as oil, coal and gas. Today, we live in an exceptional
Posted By : Admin;  (Posted 3 years ago)..
 
Dec
31
List Of Developers In TN Solar Bidding
Final count – 499 MW/ 92 Applications/104 projects (Note: The application number and number of projects is subject to confirmation from Tangedco)
 
 
The biggest question in front of the government is how will it achieve its target of 1000 MW in 2013 and Will the higher bidders ac
Posted By : Admin;  (Posted 4 years ago)..
 
Dec
31
Kochi to be Tagged Solar City Soon
If all goes as per plans, Kochi will be the first solar city in the state. However, the Opposition of the Kochi Corporation feels that more clarity is needed regarding the project and its feasibility. Criticising the Corporation Town Planning Committee for not providing adequate data to the International Council for Local Environmental Init
Posted By : solarneed  (Posted 4 years ago)..
City : Meerut
 
Dec
31
Development of Solar Cities in India
The Ministry of New and Renewable Energy has been implementing a programme on “Development of Solar Cities” under which a total of 60 cities/towns are proposed to be supported for development as “Solar/ Green Cities”. So far, in principle approval has been accorded to 55 cities of which 45 cities have been sanctioned
Posted By : Admin;  (Posted 3 years ago)..
 
    Page: 1 2 3 4 5 6 7 8 9
 
 
SYNERGY MAXX TECHNOLOGY
# H4/47B, UGF,MAHAVIR ENCLAVE
DELHI, INDIA,110045
E-MAIL: rk@synergymaxx.com
Tel: +91-11-25044623
Mobile: +91 9968857965
 
Most Popular Blogs
Rooftop solar powers past new milestone
More than 3 gigawatts of solar power has now been installed on Australian rooftops, which will produce enough energy over the nex...View More
 2013, Dec Sun  by ‘‘Solarneed’’
Accenture To Help Azure Power Expand Its Solar Generation Business
Accenture has been selected by Azure Power, India’s leading independent solar power producer, to implement an SAP&re...View More
 2014, Apr Fri  by ‘‘Admin’’
India likely to impose steep Dumping Duty on Solar Gear Importers
India is likely to impose a steep duty on importers of solar cells following vociferous complaints from domestic manufactu...View More
 2014, May Tue  by ‘‘Admin’’
Solar energy ambitions take shape as costs tumble
Solar energy ambitions take shape as costs tumble
Written by Akshata
View More
 2014, Feb Sun  by ‘‘Admin’’
 
Latest News
Installation of 2Kw rooftop with Battery bank in Gurgaon
Synergy Maxx team has installed it 2Kw rooftop system in Sushant Lok-2,Gurgaon we are executing next 5KW and 10KW project in Gurgaon soon.

Commissioning of 2KW and 10KW solar System In Haryana
Synergymaxx team is commissioning one 2Kw rooftop system and second 10KW rooftop in Haryana.

JA Solar has signed an MOU with Essel Infraproject Ltd
JA Solar has signed an MOU (memorandum of understanding) with Essel Infraproject Ltd (EIL) in India for a JV solar cell and module manufacturing plant in India. Essel Infraproject is the PV project and infrastructure arm of Essel Group.

Haryana makes solar power must for all buildings
The Haryana government has decided to usher in the New Year with one of the biggest pushes for solar power in the country. The state has made it mandatory for all buildings on plot size of 500 square yards or more to install rooftop solar power systems by

Synergymaxx New Installation 1Kw solar Roof top
Synergymaxx has installed 1kw Solar rooftop system with battery backup in Bijnor where electricity cut is for 6-8 hours. we are working towards our goal to enlighten future of next Generation.

Home     About Us     Contact Us     Top Blogs   ABC's Of Solar
Copyright © 2013-14